Ceragon FA4800 User Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 241
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
2
Installing the
This chapter describes how to install and perform the basic setup for
outdoor units (ODUs) in a
Topics covered here include:
Preparing the installation site
Unpacking and examining the ODU
Installing the ODU
Powering the ODU
Aligning the ODU
Initializing network connection
2.1
Site Preparation
Carefully select and prepare each
configuration as simple and trouble
always consider the long-
term needs of both your network and your applications.
Physical Requirements
Each FibeAir 70
ODU site should adhere to the following requirements:
Install the
FibeAir 70
conform to the equipment operational requirements specified in
A clear, unobstructed line
Mount the
FibeAir 70
steel mounting pole is required, with a diameter measuring from 2
centimeters).
Caution:
Do not mount the
moved. Doing say may result in poor service or equipment damage.
Install the
FibeAir 70
Cabling Requirements
Ensure that your
power connection cable matches the
connector pin-
outs. See
Installing the
FibeAir 70
This chapter describes how to install and perform the basic setup for
FibeAir 70
FibeAir 70 wireless network.
Topics covered here include:
Preparing the installation site
Unpacking and examining the ODU
Initializing network connection
Site Preparation
Carefully select and prepare each
FibeAir 70
ODU site to make device installation and
configuration as simple and trouble
-
free as possible. During selection and preparation,
term needs of both your network and your applications.
ODU site should adhere to the following requirements:
FibeAir 70
ODU onl
y at a site where environmental conditions
conform to the equipment operational requirements specified in
Section
A clear, unobstructed line
-of-sight between FibeAir 70 ODU nodes.
FibeAir 70
ODU on a fixed, stable, permanent structure. A reinforced
steel mounting pole is required, with a diameter measuring from 2
-
4 inches (5
Do not mount the
FibeAir 70
device on a structure that is temporary or easily
moved. Doing say may result in poor service or equipment damage.
FibeAir 70
ODU where it is easily accessed after mounting.
power connection cable matches the
FibeAir 70
power
outs. See
Figure 2-2 for the DC power connector pin-
out diagram.
Page 17
FibeAir 70
antenna
ODU site to make device installation and
free as possible. During selection and preparation,
term needs of both your network and your applications.
y at a site where environmental conditions
Section
1.5.
ODU on a fixed, stable, permanent structure. A reinforced
4 inches (5
-10
device on a structure that is temporary or easily
moved. Doing say may result in poor service or equipment damage.
power
out diagram.
4Gon www.4Gon.co.uk [email protected] Tel: +44 (0)1245 808295 Fax: +44 (0)1245 808299
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 240 241

Comments to this Manuals

No comments